Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers. Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Partitions, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Flagpoles.įurnishings, Window Treatments, Casework, Rugs and Mats, Office Furniture, Multiple Seating.įire Suppression, Water-Based Fire-Suppression Systems, Fire-Suppression Sprinkler Systems, Fire-Extinguishing Systems. Openings, Doors and Frames, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Entrances and Storefronts, Entrances, Curtain Wall and Glazed Assemblies, Windows, Hardware.įinishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Acoustic Treatment, Painting and Coating, Painting. Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Thermal Insulation, Weather Barriers. Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork, Architectural Woodwork. Cash deposits will not be accepted.Įxisting Conditions, Demolition, Selective Demolition, Selective Interior Demolition.Ĭoncrete, Concrete Forming and Accessories, Concrete Forming, Cast-in-Place Concrete, Precast Concrete. Deposit will be refunded to bidders upon return of their complete set of Bidding Documents, including any addenda, properly bound and in good condition to Beeline and Blue within 14 calendar days after opening of bids. Upon failure to comply, said check or bid bond shall become forfeited as liquidated damages. A certified check drawn upon a solvent bank or bid bond executed by corporations authorized to contract as surety in lowa, and submitted on AIA Document A310 - Bid Bond, in the amount of five percent (5%) of the total bid and made payable to "JASPER COUNTY", shall be filed with each bidder's proposal as a guarantee that the accepted bidder shall enter into a contract with Jasper County and file an approved surety company Performance and Payment Bond for the faithful performance thereof. Bidders are requested to propose dates for project mobilization and project completion on their bid. Subcontractors for major trades shall be named by the General Contractors on the official bid form. Bids shall be on a stipulated sum basis segregated bids will not be accepted. The Owner's intent is to hold a contract with a single General Contractor. The project also includes coordination with Owner's contractors for furnishings, floor finishes and painting. Scope includes selective demolition, existing plaster wall opening modifications, doors and trim, hardwood casework, and _ electrical modifications. The general scope of Work includes, but is not limited to renovations of approximately 1,500 square feet of existing office space within the Jasper County Courthouse. RFP Design - Woodward Resource Center Utility Decentralization Johnson County Courthouse Remodeling - Project 1- Floor InfillĬedar Rapids Homeless Housing and Job Center Jasper County Recorder Denise Allan said it will improve accessibility to the recorder’s office, which is currently located on the second floor of the courthouse.Clay County Attorney and Veteran Services Renovation With the bottom offices likely to vacate in the next few months, Talsma suggested the move made sense. Jasper County Supervisor Brandon Talsma recalled seeing a wheelchair-bound customer exit the current recorder’s office some time ago. Sparks wanted to know if the recorder’s office relocation was still a project the board wanted to move forward with.Įlected officials indicated they still wished to pursue the project. Jasper County Maintenance Director Adam Sparks said the idea of what to do with the treasurer’s office and DMV after moving to the new building was talked about during budget hearings this year. The relocation will cost the county $18,990 in schematic designs, construction bid documentations, bidding/negotiating assistance and construction administration. The board of supervisors authorized the move during its April 12 meeting after approving professional design services by BBS Architects Engineers. Officials say the move will greatly increase accessibility. When the Jasper County administration building is completed and the driver’s license and motor vehicle department occupies its new offices, the recorder’s office staff will eventually move in to the vacant, first-floor workplace left behind in the courthouse.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |